The existing trade fair guidance system is to be fundamentally renewed and adapted to the increased complexity of handling very high (heavy) traffic loads in inner-city areas.
A traffic study provided the basis for the redesign of the area in front of the central station in Mannheim.
A cost-benefit and potential analysis were conducted to optimize conditions for fast cyclists on the RS2 cycle route in Münsterland, northwestern Westphalia.
PTV examined how to maintain smooth traffic flow during construction work on the frequently-used Finkenwerder bridge.
To ensure smooth traffic during events at Signal-Iduna-Park and Westfalenhallen in Dortmund, a transport concept was developed.
The A99 highway is one of the busiest in Germany. PTV investigated how to best expand the Munich East interchange.
On behalf of the German Federal Ministry of Transport and Infrastructure, PTV oversees the feasibility study on the operation of hybrid trolley buses in Berlin-Spandau.
Our team supported Hallesche Verkehrs-AG (HAVAG) with feasibility and planning studies for the expansion of a sustainable light rail system.
For Berliner Verkehrsbetriebe BVG, PTV Transport Consult enhanced the existing transport model in terms of content and methodology.